House extension at Mogeely Road, Grange, Castlemartyr, Co. Cork, P25 H9P3
Planning application 25/6459 to Cork County Council.
Permission for demolition of two sections of the existing single-storey warehouse buildings (Block 6 and Block 7) and the construction of a new single-storey extension linking Blocks 6 and 7 to provide additional floor area for production purposes, together with the construction of a new single-storey extension to the south-east side of Block 7 (total floor area approximately 694m2). The proposed development also includes the construction of a new generator room, the relocation of the existing dust extraction and biomass burner systems, the installation of solar photovoltaic (PV) panels on both existing and proposed roof structures, and all associated site development works and services.
Decision
28 May 2026
28 weeks after it was received
Key dates
Application received
Permission granted
Commencement notice lodged
Application details
- Council
- Cork County Council
- Reference
- 25/6459
- Site address
- Mogeely Road, Grange, Castlemartyr, Co. Cork, P25 H9P3
- Town or area
- Castlemartyr
- Type of project
- House extension
Planning something near here?
The pre-planning report checks zoning, protected structures, nature sites and every application near your address, with the decisions.
Source: National Planning Application Database and Cork County Council, licensed under CC BY 4.0. Applicant names are never published. Request removal of this record. This page is a guide and may be out of date, so check the council portal for the latest.

